Rigging and Installation Instructions for Single Piece
and Multiple Piece Energy Recovery Plenums
Due to the custom design and build nature of Loren Cook equipment these
instructions are given as general information and are not model specific.
This discussion is broken down into five separate sections of consideration for setting a
single or multiple piece Energy Recovery Plenum. These five areas are as follows:
Section 1.0: Pre-Lift considerations
Section 2.0: Receiving of the equipment
Section 3.0: Rigging of the equipment
Section 4.0: Assembly of the sections
Section 5.0: Finish work for the Installation
Section 6.0: Installation of Extended Exhaust Porch
Section 7.0: Recommended Tools
Zobrazit stránku 0
1 2 3 4 5 6 ... 17 18

Shrnutí obsahu

Strany 1

Rigging and Installation Instructions for Single Piece and Multiple Piece Energy Recovery Plenums Due to the custom design and build natu

Strany 2 - 1.0 Pre-Lift Considerations

Figure 3.3 Bolting Method Inside Demount – Angles Figure 3.4 Bolting Method Inside Demount – Flat Plates

Strany 3

Figure 3.5 Bolting Method Inside Demount – Four Corner Connection

Strany 4

4.1 Water Shedding Components If the equipment is designed as an outdoor unit it will be supplied with a water shedding roof installed over the pan

Strany 5 - Figure 1

Figure 7 Typical Outdoor Units, Water Shed Panels Center Pitched Roof, Water Shed Panels Perpendicular to Pitch of Roof

Strany 6 - FOR EACH LIFT!

5.0 Finish Work for the Installation Once the equipment has been set and completely bolted together, the following finish work must be done to comp

Strany 7

6.0 Installation of Extended Exhaust Porch The final step in assembly of the equipment is the installation of the extended exhaust. 1. Caulk

Strany 10

7.0 Recommended Tools The following are recommended tools that the contractor should have on hand for the rigging. Provisions of these tools are at

Strany 11

1.0 Pre-Lift Considerations Curbs may be structural steel, formed concrete or formed metal. A Loren Cook supplied formed metal curb will be shipp

Strany 12

2.0: Receiving of the Equipment Most equipment delivered is shipped FOB Factory. Once the equipment is loaded on the trailer, it ownership and resp

Strany 13

2.1.2 Long-Term Storage Long-term storage is considered to be any period longer than six (6) months from date of shipment. If long-term storage i

Strany 14

Adjustable pulley forevery two lifting eyes.Adjustable clampfor adjusting widthof spreader.Figure 1 is an example of a rigging and spreader bar unit.

Strany 15 - (as seen in above picture)

3.1 Rigging a Single Piece Unit Note: Use all of the lifting points provided on the equipment. Loren Cook will not be responsible for damages incu

Strany 16

3.2 Rigging a Multiple Section Unit Note: Use all of the lifting points provided on the equipment. Loren Cook will not be responsible for damages

Strany 17

4.0 Assembly of the Sections Apply the 1”x3/8” gasket material to the frame as shown in figure 3. Apply this gasket to only one section of the two